And in these situations if test case are already written and continuously client is changing requirements instead of updating all the TC will wait and update only during execution so that it can save time and we have the final one at the time of execution. By checking the status of the bug we can know whether its fixed or not and can confirm the same by retesting the scenario which was reported in bug.
As per Project is concerned, we are working for customers and their requirements to be met Please Turn OFF your ad blocker. Learn More. If the customer requirements are changing continuously as a tester how you are going to manage the situation?
Suppose you have prepared test cases but still some more time is required to receive the build in between time what you can do? How you know the bug you sent is fixed or not? Bug Tracking. First Prev Next Last. Showing Answers 1 - 7 of 7 Answers. Oksana Sep 5th, The information at. The top of the file is XML namespace.
Can any Testing genius can suggest me. How we can test the performance of an application by manual with out using any tool like loadrunner etc? What can be done if requirements are changing continuously?
Answers were Sorted based on User's Feedback What can be done if requirements are changing continuously?.. Is This Answer Correct? What can be done if requirements are changing continuously?.. More Manual Testing Interview Questions.
Here, I'm going to describe some basic things that we need to take care when requirements are changing continuously. Devote appropriate effort to risk analysis of changes, in order to minimize regression-testing needs. In the project's initial stages, allow for some extra time to commensurate with probable changes.
Balance the effort put into setting up automated testing with the expected effort required to redo them to deal with changes. Design some flexibility into test cases; this is not easily done; the best bet is to minimize the detail in the test cases, or set up only higher-level generic-type test plans.
0コメント